2022
DOI: 10.1088/1755-1315/1079/1/012109
|View full text |Cite
|
Sign up to set email alerts
|

Optimization of turbine start-up sequence of a full size frequency converter variable speed pump-turbine

Abstract: The stability of the electricity grid will be disrupted by the massive integration of new renewable energies. Hydropower plants have a major role to play in this transformation of the electricity market by increasing their operational flexibility and their ability to provide ancillary services. However, this flexibility may lead to an accelerated degradation of mechanical components. By changing the turbine operating point far from the best efficiency point or by increasing the number of transient manoeuvres s… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 8 publications
0
2
0
Order By: Relevance
“…Zhang and Tongji (2011) redesigned the hardware of the hydropower station hydraulic monitoring system Tianqiao hydropower to achieve multi-channel data acquisition, multi-functional analysis, and visualisation operations. To minimize the runner damage, the penstock fatigue and the water losses in a pumpturbine, Schmid et al (2022) proposed an optimisation approach to determine a start-up sequence. Valentín et al (2022) compared the hybrid mode and the standard mode (non-hybrid) in terms of mileage and wear and tear of the guide vanes and runner blades servomotors.…”
Section: Condition Monitoring In Hydroelectric Power Plantsmentioning
confidence: 99%
“…Zhang and Tongji (2011) redesigned the hardware of the hydropower station hydraulic monitoring system Tianqiao hydropower to achieve multi-channel data acquisition, multi-functional analysis, and visualisation operations. To minimize the runner damage, the penstock fatigue and the water losses in a pumpturbine, Schmid et al (2022) proposed an optimisation approach to determine a start-up sequence. Valentín et al (2022) compared the hybrid mode and the standard mode (non-hybrid) in terms of mileage and wear and tear of the guide vanes and runner blades servomotors.…”
Section: Condition Monitoring In Hydroelectric Power Plantsmentioning
confidence: 99%
“…Various studies include transient water hammer simulations for the entire hydro power plant with all water-bearing elements such as the piping system, valves, bifurcations, surge tanks, and hydraulic units for all operating points [4], control processes [5][6][7], and emergency scenarios.…”
Section: Introductionmentioning
confidence: 99%