Thirteenth International Conference on Digital Image Processing (ICDIP 2021) 2021
DOI: 10.1117/12.2601054
|View full text |Cite
|
Sign up to set email alerts
|

Optimization of reservoir operation scheme based on fuzzy optimization and convolutional neural network

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 5 publications
0
2
0
Order By: Relevance
“…This paper refers to Hu et al (2021), uses CNN as the benchmark model for reservoir operation scheme selection, and uses fuzzy optimization theory to construct CNN training samples. Firstly, the evaluation index system is constructed according to the fuzzy optimization theory; Secondly, the weight of each evaluation index is determined, the subjective weight is determined by analytic hierarchy process, the objective weight is determined by entropy weight method, and the comprehensive weight is obtained by coupling the subjective and objective weights by game theory; Finally, the comprehensive evaluation value of the scheme is calculated by fuzzy comprehensive evaluation, and the initial sample of CNN model is obtained.…”
Section: Overall Research Methodologymentioning
confidence: 99%
See 1 more Smart Citation
“…This paper refers to Hu et al (2021), uses CNN as the benchmark model for reservoir operation scheme selection, and uses fuzzy optimization theory to construct CNN training samples. Firstly, the evaluation index system is constructed according to the fuzzy optimization theory; Secondly, the weight of each evaluation index is determined, the subjective weight is determined by analytic hierarchy process, the objective weight is determined by entropy weight method, and the comprehensive weight is obtained by coupling the subjective and objective weights by game theory; Finally, the comprehensive evaluation value of the scheme is calculated by fuzzy comprehensive evaluation, and the initial sample of CNN model is obtained.…”
Section: Overall Research Methodologymentioning
confidence: 99%
“…In this paper, the Xidayang reservoir (Hu et al, 2021) is selected as the research object, and many reservoir operation schemes generated by the reservoir multi-objective operation model are used as the experimental data set, including the flood data of the Xidayang reservoir with 10-year return period (data set 1), 20-year return period (data set 2) and 50-year return period (data set 3). Each data has six characteristic columns, which are water resources conversion, water level recovery level, peak shaving amplitude, drawdown depth, recovery time and maximum water level variation.…”
Section: Data Preprocessingmentioning
confidence: 99%