2017
DOI: 10.1016/j.compchemeng.2017.01.007
|View full text |Cite|
|
Sign up to set email alerts
|

Optimization of multipurpose process plant operations: A multi-time-scale maintenance and production scheduling approach

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
39
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 43 publications
(41 citation statements)
references
References 22 publications
0
39
0
Order By: Relevance
“…In many processes, such as polymerization reactions, or purification processes, it is not uncommon for the unit capacity to "degrade" after a task has been processed on that unit [76][77][78][79][80][81]. This can be, for example, due to residue formation (e.g., scaling) or impurity accumulation (e.g., membrane pore blockages).…”
Section: Unit Capacity Degradation and Maintenancementioning
confidence: 99%
“…In many processes, such as polymerization reactions, or purification processes, it is not uncommon for the unit capacity to "degrade" after a task has been processed on that unit [76][77][78][79][80][81]. This can be, for example, due to residue formation (e.g., scaling) or impurity accumulation (e.g., membrane pore blockages).…”
Section: Unit Capacity Degradation and Maintenancementioning
confidence: 99%
“…In comparison to Biondi et al 18 , the residual lifetime constraints have been replaced with the degradation signal based health model developed above (Eqn. 9).…”
Section: Case Studymentioning
confidence: 99%
“…Fig. 5 shows three maintenance schedules for the original STN instance (P1) by Kondili et al 19 Week Figure 5: Comparison of maintenance schedules between deterministic solution (α = 0.5) and two robust solutions with different values of α (Instance P1 19 , average demand scenario by Biondi et al 18 ). The number of required maintenance actions increases with increasing uncertainty set size (decreasing α).…”
Section: Instancementioning
confidence: 99%
“…One of the major criteria focused in the development of power system is the optimization of power plant scheduling. Production and maintenance scheduling is very important to run an effective operation process plants [19]. Improper and suboptimal maintenance schedule can increase the production costs and decreases the system reliability.…”
Section: Maintenance Optimizationmentioning
confidence: 99%
“…In other words, there is no guarantee that the maintenance system produced is a reliable and systematic thus an optimal solution is not achieved. The purpose of an optimized maintenance scheduling is to identify the method of scheduled outages of generating units over a given period such that the amount of energy supplied to the customers is maintained [19]. This type of schedule is important mainly in a maintenance activity because will directly affects other planning activities [20].…”
Section: Maintenance Optimizationmentioning
confidence: 99%