2019 IEEE Industry Applications Society Annual Meeting 2019
DOI: 10.1109/ias.2019.8912455
|View full text |Cite
|
Sign up to set email alerts
|

Optimization of Energy Consumption in STS Group Cranes by Using Hybrid Energy Storage Systems Based on PSO Algorithm

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
3
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 12 publications
0
3
0
Order By: Relevance
“…In the main substation, two independent 66 kV lines with double bus-bar are recommended in which reliability is enhanced. However, for the mentation of these proposed aims, as a first and main step, it is required to accomplish the cranes' duty cycle operation to reduce the peak power, or regenerative energy flows into the grid from this starting point, thus a flywheel energy storage system (FESS) is proposed [10,11]. An STS crane is able to unload two 40 ft. containers at once, with a cycle that is completed by two independent cranes mounted on the same frame, while sharing a common platform.…”
mentioning
confidence: 99%
See 2 more Smart Citations
“…In the main substation, two independent 66 kV lines with double bus-bar are recommended in which reliability is enhanced. However, for the mentation of these proposed aims, as a first and main step, it is required to accomplish the cranes' duty cycle operation to reduce the peak power, or regenerative energy flows into the grid from this starting point, thus a flywheel energy storage system (FESS) is proposed [10,11]. An STS crane is able to unload two 40 ft. containers at once, with a cycle that is completed by two independent cranes mounted on the same frame, while sharing a common platform.…”
mentioning
confidence: 99%
“…Table 1 shows the dimensions, both in feet and meters, of the considered crane, as well as the expected times in which the crane is expected to execute the task of the cycle. However, for the mentation of these proposed aims, as a first and main step, it is required to accomplish the cranes' duty cycle operation to reduce the peak power, or regenerative energy flows into the grid from this starting point, thus a flywheel energy storage system (FESS) is proposed [10,11].…”
mentioning
confidence: 99%
See 1 more Smart Citation