2018
DOI: 10.1061/(asce)cf.1943-5509.0001073
|View full text |Cite
|
Sign up to set email alerts
|

Optimization of Deck Construction Staging for Multiple-Span Continuous Steel Girder Bridge

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(1 citation statement)
references
References 16 publications
0
1
0
Order By: Relevance
“…Su et al [28] optimized the deck construction staging for multiple-span continuous steel girder bridges. In their study, the cracking of a typical multiple-span continuous bridge was investigated, and the construction staging was evaluated, and an optimized practice for deck construction staging was provided.…”
Section: Introductionmentioning
confidence: 99%
“…Su et al [28] optimized the deck construction staging for multiple-span continuous steel girder bridges. In their study, the cracking of a typical multiple-span continuous bridge was investigated, and the construction staging was evaluated, and an optimized practice for deck construction staging was provided.…”
Section: Introductionmentioning
confidence: 99%