2016
DOI: 10.1287/trsc.2014.0580
|View full text |Cite
|
Sign up to set email alerts
|

Optimization Methods for Multistage Freight Train Formation

Abstract: T his paper considers mathematical optimization for the multistage train formation problem, which at the core is the allocation of classification yard formation tracks to outbound freight trains, subject to realistic constraints on train scheduling, arrival and departure timeliness, and track capacity. The problem formulation allows the temporary storage of freight cars on a dedicated mixed-usage track. This real-world practice increases the capacity of the yard, measured in the number of simultaneous trains t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
37
0
1

Year Published

2017
2017
2024
2024

Publication Types

Select...
4
2

Relationship

1
5

Authors

Journals

citations
Cited by 35 publications
(38 citation statements)
references
References 28 publications
0
37
0
1
Order By: Relevance
“…There are numerous tactics for sorting the wagons using roll-ins and pull-backs (see e.g. Boysen et al (2012) or Gatto et al (2009) for an overview), and this paper considers the practice used in Sweden: multi-stage train formation with mixing tracks (see next section for an introduction, or Bohlin et al (2015) for a more thorough description).…”
Section: Marshalling Yard Operationsmentioning
confidence: 99%
See 4 more Smart Citations
“…There are numerous tactics for sorting the wagons using roll-ins and pull-backs (see e.g. Boysen et al (2012) or Gatto et al (2009) for an overview), and this paper considers the practice used in Sweden: multi-stage train formation with mixing tracks (see next section for an introduction, or Bohlin et al (2015) for a more thorough description).…”
Section: Marshalling Yard Operationsmentioning
confidence: 99%
“…Their exact methods are faster than CPLEX and the heuristic tabu search yields near optimal solutions. Bohlin et al (2015) presents three integer programming models, D-IP, GC-IP and A-IP, for solving the multi-stage train formation problem with mixing tracks given a wagonto-train allocation, fixed roll-in, pull-back and roll-out times, and no wagon ordering in inbound or outbound trains. The models find the classification bowl track allocation that minimises the work effort required.…”
Section: Related Workmentioning
confidence: 99%
See 3 more Smart Citations