Optimization Method of Reducing the Differential Settlements of Piled Raft Foundations Based on Pile‐to‐Pile Interaction Theory

Abstract: In order to reduce the differential settlement of piled raft foundations, an optimization method based on pile-to-pile interaction theory is proposed in this paper, which translates the problem of pile-to-pile interaction (PPI) in pile groups into that in single piles using the interaction factor method. The pile lengths were adjusted via the relationship between load, settlement, and the length of single piles during the optimization design. ANSYS software, in conjunction with nonlinear elastic soil model, is… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 36 publications
0
2
0
Order By: Relevance
“…Combined with the engineering characteristics and site conditions, double row triple highpressure jet grouting piles are constructed around the foundation pit to strengthen the surrounding soil and cut off the seepage path of the peripheral groundwater into the foundation pit. e foundation pit support method is "double row jet grouting pile sealing curtain + artificial excavated pile + anchor cable," which is widely used in the foundation engineering [29,30]. e layout of foundation pit monitoring points is shown in Figure 1, where C1-C4 represent the driveway.…”
Section: Project Overview and Support Schemementioning
confidence: 99%
“…Combined with the engineering characteristics and site conditions, double row triple highpressure jet grouting piles are constructed around the foundation pit to strengthen the surrounding soil and cut off the seepage path of the peripheral groundwater into the foundation pit. e foundation pit support method is "double row jet grouting pile sealing curtain + artificial excavated pile + anchor cable," which is widely used in the foundation engineering [29,30]. e layout of foundation pit monitoring points is shown in Figure 1, where C1-C4 represent the driveway.…”
Section: Project Overview and Support Schemementioning
confidence: 99%
“…Similarly, many researchers have studied piled raft foundation systems. It has been reported that by increasing the pile length, pile diameter, aspect ratio, number of piles, and raft foundation thickness, the overall performance of piled raft foundations improves considerably (e.g., El-Garhy et al, 2013;Lin and Feng, 2006;Mali and Sing, 2020;Sinha and Hanna, 2017;Vu et al, 2014;Xie and Chi, 2020).…”
Section: Introductionmentioning
confidence: 99%