2013
DOI: 10.1057/jors.2012.42
|View full text |Cite
|
Sign up to set email alerts
|

Optimising passing bay locations and vehicle schedules in underground mines

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2020
2020
2021
2021

Publication Types

Select...
3
1

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 6 publications
0
3
0
Order By: Relevance
“…The start-up time control of the transport units is able to improve the transport efficiency of the underground mines, and the function of the start-up time control is accomplished through the monitoring and control of the ATS system. As early as 2013, Anjomshoa et al, [41] optimized the vehicle schedules in underground mines to control the start of the transport units. In 2016, GEORGESCU [42] made the improvements to the CBTC system based on driver-less technology and Internet of Things technology, and he proposed using the ATS system of the CBTC system to realize the start and stop of the driver-less train.…”
Section: B the Start-up Time Control Of The Transport Unitsmentioning
confidence: 99%
“…The start-up time control of the transport units is able to improve the transport efficiency of the underground mines, and the function of the start-up time control is accomplished through the monitoring and control of the ATS system. As early as 2013, Anjomshoa et al, [41] optimized the vehicle schedules in underground mines to control the start of the transport units. In 2016, GEORGESCU [42] made the improvements to the CBTC system based on driver-less technology and Internet of Things technology, and he proposed using the ATS system of the CBTC system to realize the start and stop of the driver-less train.…”
Section: B the Start-up Time Control Of The Transport Unitsmentioning
confidence: 99%
“…The start-up time control of the transport units is able to improve the transport efficiency of the underground mines, and the function of the start-up time control is accomplished through the monitoring and control of ATS system. As early as 2013, H. Anjomshoa et al [23] optimized the vehicle schedules in underground mines to control the start of the transport units. And in the year 2016, M. P. GEORGESCU [24] made the improvements to the CBTC system based on driver-less technology and Internet of things technology, and he proposed to use the ATS system of CBTC system to realize the start and stop of the driver-less train.…”
Section: ) the Start-up Time Control Of The Transport Unitsmentioning
confidence: 99%
“…In this paper, we summarise our two approaches: (i) the simulator we developed (Anjomshoa et al, 2010) to model the movements of vehicles through a mine for specified passing locations; and (ii) a mixed integer programming (MIP) model that we developed to find the optimal locations of passing bays and optimal vehicle schedules. [Full details of the mathematics are given by Anjomshoa (2011) and Anjomshoa et al (2011).] However, our main focus in this paper is to interpret the results from our two approaches as they apply to mine design and operations with haulage trucks or road trains.…”
Section: Introductionmentioning
confidence: 99%