2023
DOI: 10.1016/j.enbuild.2023.113219
|View full text |Cite
|
Sign up to set email alerts
|

Optimising LCA in complex buildings with MLCAQ: A BIM-based methodology for automated multi-criteria materials selection

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0
1

Year Published

2024
2024
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 32 publications
0
1
0
1
Order By: Relevance
“…Because full automation relies on default values set by the model system, it can lead to significant changes in simulation predictions and compromise the objectivity and reliability of the simulation output [120]. Serrano-Baena, Ruiz-Díaz [121] used the MLCAQ approach to provide a reliable method for automated multi-criteria comparison of building materials from an environmental point of view based on BIM, and this open-source methodology linking the IFC components with the Constructive Solutions Database will become a popular international resource. BIM3LCA has been developed to address the difficulty of automatically comparing alternative design solutions for different material choices, and real-time LCSA calculations are possible through native BIM software development [122].…”
Section: Degree Of Automationmentioning
confidence: 99%
“…Because full automation relies on default values set by the model system, it can lead to significant changes in simulation predictions and compromise the objectivity and reliability of the simulation output [120]. Serrano-Baena, Ruiz-Díaz [121] used the MLCAQ approach to provide a reliable method for automated multi-criteria comparison of building materials from an environmental point of view based on BIM, and this open-source methodology linking the IFC components with the Constructive Solutions Database will become a popular international resource. BIM3LCA has been developed to address the difficulty of automatically comparing alternative design solutions for different material choices, and real-time LCSA calculations are possible through native BIM software development [122].…”
Section: Degree Of Automationmentioning
confidence: 99%
“…Apresenta características como: a partilha de informação geométrica e não geométrica, através de ficheiros IFC; a sincronização da informação partilhada dos modelos das especialidades do projeto e a obtenção do modelo federado do edifício. O Open BIM Quantities, foi desenvolvido no âmbito do projeto europeu Circular BIM [6] [7] para integrar a medição, a orçamentação e a análise de impacte ambiental num fluxo de trabalho colaborativo, através da sincronização de ficheiros IFC e BC3.…”
Section: Introductionunclassified