2011
DOI: 10.1504/ijdats.2011.038805
|View full text |Cite
|
Sign up to set email alerts
|

Optimising industrial performance improvement within a quantitative multi-criteria aggregation framework

Abstract: International audienceThe major industrial control purpose is the reaching of the expected performances. In this sense, improvement processes are continuously carried out in order to define the right actions with regard to the objectives achievement. Thus, in order to better monitor the performance continuous improvement process, we consider a quantitative model for performance assessment. The industrial performance being multi-criteria, the proposed model is thus based on the one hand, on the MACBETH method t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
7
0

Year Published

2013
2013
2022
2022

Publication Types

Select...
5
1

Relationship

1
5

Authors

Journals

citations
Cited by 8 publications
(7 citation statements)
references
References 33 publications
(36 reference statements)
0
7
0
Order By: Relevance
“…The main functionality of this PMS is a formal unified framework for quantifying both monocriterion interacting performances and overall performance. Such a framework has been used to optimising performance improvement by quantifying efficacy and efficiency of the improvement (Berrah et al 2011).…”
Section: State Of the Art And Research Assumptionsmentioning
confidence: 99%
“…The main functionality of this PMS is a formal unified framework for quantifying both monocriterion interacting performances and overall performance. Such a framework has been used to optimising performance improvement by quantifying efficacy and efficiency of the improvement (Berrah et al 2011).…”
Section: State Of the Art And Research Assumptionsmentioning
confidence: 99%
“…For the sake of conciseness, the considered physical system is the Hydraulic Cylinders (HC) (see Figure 7). Decision-makers looked first for a better explanation of the current situation [53]. Although several action plans have been launched in order to increase the lead time, the current state of the HC line needs more improvement, in terms of working, regarding the takt time, the delays related to the supply service, the lack of synchronicities in the different involved processes……”
Section: The Company's Industrial Systemmentioning
confidence: 99%
“…A partnership is established between the company and the LISTIC laboratory, leading, from an academic point of view, to Phd theses and international publications. That is why the industrial system description is quite similar to the one given in[53]. For the sake of confidentiality, the considered values are purely indicative.…”
mentioning
confidence: 92%
“…When designing improvement measures for complex systems, multiple decisions need to be considered [3]. Examples include military information architecture [47] and industrial device performance improvement [5,34]. Such settings increase the multidisciplinary design complexity regarding the fulfillment of functional, technical, environmental, economic and security requirements.…”
Section: Introductionmentioning
confidence: 99%