2009
DOI: 10.1016/j.egypro.2009.02.201
|View full text |Cite
|
Sign up to set email alerts
|

Optimisation economics for CO2 capture and storage in Central Queensland (Australia)

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
4
0

Year Published

2010
2010
2015
2015

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 9 publications
(4 citation statements)
references
References 0 publications
0
4
0
Order By: Relevance
“…The disposal cost of CO 2 is assumed to be 25% of the construction and the project management cost. Other costs are supposed to depend on the IEA guideline and the Bukhteeva, Neal, and Allinson (2009).…”
Section: Geosystem Engineering 45mentioning
confidence: 99%
“…The disposal cost of CO 2 is assumed to be 25% of the construction and the project management cost. Other costs are supposed to depend on the IEA guideline and the Bukhteeva, Neal, and Allinson (2009).…”
Section: Geosystem Engineering 45mentioning
confidence: 99%
“…The costs (shown in Figure S3 in the Supporting Information) of a CCS project could be broken down into capture, pipelines, storage, and other costs . The capture and purification of CO 2 demands a substantial portion (up to 80%) of CCS capital investment.…”
Section: Ccs: Economic Issuesmentioning
confidence: 99%
“…Tel. : +61 2 9385 4755; fax: +61 2 9385 5966. in Australia, China, the Middle East and certain parts of Europe Bukhteeva et al, 2009;IEAGHG, 2010;Wildenborg et al, 2009). One way to reduce these costs is by optimising the design of the pipeline network that links the CO 2 sources and sinks.…”
Section: Introductionmentioning
confidence: 99%