2014
DOI: 10.1016/j.ijpe.2014.02.004
|View full text |Cite
|
Sign up to set email alerts
|

Optimal vendor investment for reducing defect rate in a vendor–buyer integrated system with imperfect production process

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
30
0

Year Published

2015
2015
2019
2019

Publication Types

Select...
5
4

Relationship

0
9

Authors

Journals

citations
Cited by 59 publications
(37 citation statements)
references
References 23 publications
0
30
0
Order By: Relevance
“…And finally Dey.O and Giri.B.C [4] developed the optimal vendor investment for reducing defect rate in vendor-buyer integrated system for imperfect production process. In that the production is imperfect in stochastic demand.…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…And finally Dey.O and Giri.B.C [4] developed the optimal vendor investment for reducing defect rate in vendor-buyer integrated system for imperfect production process. In that the production is imperfect in stochastic demand.…”
Section: Literature Reviewmentioning
confidence: 99%
“…In that the production is imperfect in stochastic demand. This paper deals the similar case of Dey.O and Giri.B.C [4] but the lead time is linear in Q and without any investment. Therefore we considered the stochastic demand, an imperfect production process and finite screening period in this paper.…”
Section: Literature Reviewmentioning
confidence: 99%
“…They assumed the demand as price-sensitive and stock dependent and also the order-linked trade-credit. Dey and Giri (2014) proposed a vendor-buyer model under imperfect production; Zhang et al (2016) considered discount policy to develop their model; Li et al (2017) investigated the environmental impacts in their model. In the above studies, researchers used crisp values for the cost parameters.…”
Section: Introductionmentioning
confidence: 99%
“…Sana takes production lot size, reorder point, sales teams' initiatives as decision variables. Dey and Giri (2014) developed a single vendor and single buyer integrated model with stochastic demand and imperfect production process. They consider the inspection process as the buyer end.…”
Section: Introductionmentioning
confidence: 99%