2020
DOI: 10.1080/01605682.2020.1835450
|View full text |Cite
|
Sign up to set email alerts
|

Optimal sub-contractor selection and allocation in a multiple construction project: Project portfolio planning in practice

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
9
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
7

Relationship

2
5

Authors

Journals

citations
Cited by 11 publications
(9 citation statements)
references
References 29 publications
0
9
0
Order By: Relevance
“…The performance of a construction project depends on the abilities of the selected GC and SubC [27]. Given the increasing complexity and expertise of construction projects, GCs hire more SubCs for every work type, considering that SubCs play a critical role in construction projects [13,28]. The GC shares not only the profit with the SubCs but also the risks [13,15].…”
Section: Microscopic Viewpoint Analysis Of the Resource Planningmentioning
confidence: 99%
See 2 more Smart Citations
“…The performance of a construction project depends on the abilities of the selected GC and SubC [27]. Given the increasing complexity and expertise of construction projects, GCs hire more SubCs for every work type, considering that SubCs play a critical role in construction projects [13,28]. The GC shares not only the profit with the SubCs but also the risks [13,15].…”
Section: Microscopic Viewpoint Analysis Of the Resource Planningmentioning
confidence: 99%
“…The selection of SubCs requires a method of presenting an appropriate decision-making standard [30]. Because the performance of a project can vary based on the selected SubCs [28,31], risks can be reduced by objectively evaluating the schedule and resource input plan suggested by the SubCs for each work type [13,32]. Therefore, it is crucial for the GC to analyze the performance of the SubCs during selection, which requires quantification for resource planning and SubC analysis [13].…”
Section: Microscopic Viewpoint Analysis Of the Resource Planningmentioning
confidence: 99%
See 1 more Smart Citation
“…Villafáñez et al (2019) presented a generic heuristic method for solving resource-constrained multi-project scheduling problems. Afshar et al (2020a, 2020b) proposed a mixed-integer programming (MIP) model to manage subcontractors in multiple project environments such that minimize total cost. Hauder et al (2020) used mixed-integer and constrained programming models to allocate renewable resources in multiple projects.…”
Section: Multi-project Environmentmentioning
confidence: 99%
“…Finally, defuzzification is done on the output MFs to interpret the obtained results (Zadeh, 1975; Perng et al , 2005; Roghanian et al , 2018). In the following, the mathematical definitions of the fuzzy engine used in the present study are defined (Afshar et al , 2020a, 2020b).…”
Section: Justifying the Fuzzy Multi-criteria Decision-making Model Fo...mentioning
confidence: 99%