2018
DOI: 10.1016/j.apenergy.2017.08.165
|View full text |Cite
|
Sign up to set email alerts
|

Optimal siting and sizing of distributed generation in distribution systems with PV solar farm utilized as STATCOM (PV-STATCOM)

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
56
0

Year Published

2018
2018
2021
2021

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 106 publications
(56 citation statements)
references
References 38 publications
0
56
0
Order By: Relevance
“…Fleet management with optimal sizing and siting of PV systems would help mitigate against some challenges as a consequence of the intermittent nature of PV [182][183][184][185][186][187][188]. Several factors such as feeder losses, voltage profile, cost, line ampacity and the existence of previous PV installations are some of the primary factors to be considered when siting and sizing a PV on an existing feeder.…”
Section: Geographic Smoothing and Optimal Location Of Pv Systemsmentioning
confidence: 99%
“…Fleet management with optimal sizing and siting of PV systems would help mitigate against some challenges as a consequence of the intermittent nature of PV [182][183][184][185][186][187][188]. Several factors such as feeder losses, voltage profile, cost, line ampacity and the existence of previous PV installations are some of the primary factors to be considered when siting and sizing a PV on an existing feeder.…”
Section: Geographic Smoothing and Optimal Location Of Pv Systemsmentioning
confidence: 99%
“…Furthermore, PV-STATCOM inverters improve the stability of voltage-sensitive loads during grid fault conditions [55]. In the study of [56,57], a PV-STATCOM without a DC-DC converter was tested; reduced switch count configurations controlled the DC-link voltage through the operation of STATCOM, and the PV-STATCOM system improved the utilization factor and power quality by compensating the reactive power reference in the range of 0-1 P.U. with reduced system size and cost.…”
Section: Multilevel Pv-statcom Applications In Grid-connected Systemsmentioning
confidence: 99%
“…For multilevel STATCOMs, the AC side equality is as in (6). (6), its next value can be computed from (7).…”
Section: System Outputmentioning
confidence: 99%
“…These power plants are on-grid or off-grid [6]. In off-grid PVSESs, compensation must be applied to the system for reducing harmonics caused by the loads having reactive power and preventing injecting of the reactive power from the source [7,8]. There are many different compensation techniques.…”
Section: Introductionmentioning
confidence: 99%