PurposeThe construction of megaprojects often involves substantial risks. While insurance plays an important role as a traditional risk transfer means, owners and insurance companies may still suffer huge losses during the risk management process. Therefore, considering the strong motivation of insurance companies to participate in the on-site risk management of megaprojects, this study aims to propose a collaborative incentive mechanism involving insurance companies, to optimize the risk management effect and reduce the risk of accidents in megaprojects.Design/methodology/approachBased on principal-agent theory, the research develops the static and dynamic incentive models for risk management in megaprojects, involving both the owner and insurance company. The study examines the primary factors influencing incentive efficiency. The results are numerically simulated with a validation case. Finally, the impact of parameter changes on the stakeholders' benefits is analyzed.FindingsThe results indicate that the dynamic incentive model is available to the achievement of a flexible mechanism to ensure the benefits of contractors while protecting the benefits of the owner and insurance company. Adjusting the incentive coefficients for owners and insurance companies within a specified range promotes the growth of benefits for all parties involved. The management cost and economic benefit allocation coefficients have a positive effect on the adjustment range of the incentive coefficient, which helps implement a more flexible dynamic incentive mechanism to motivate contractors to carry out risk management to reduce risk losses.Originality/valueThis study makes up for the absence of important stakeholders in risk management. Different from traditional megaproject risk management, this model uses insurance companies as bridges to break the island effect of risk management among multiple megaprojects. This study contributes to the body of knowledge by designing appropriate dynamic incentive mechanisms in megaproject risk management through insurance company participation, and provides practical implications to both owner and insurance company on incentive contract making, thus achieving better risk governance of megaprojects.
PurposeThe construction of megaprojects often involves substantial risks. While insurance plays an important role as a traditional risk transfer means, owners and insurance companies may still suffer huge losses during the risk management process. Therefore, considering the strong motivation of insurance companies to participate in the on-site risk management of megaprojects, this study aims to propose a collaborative incentive mechanism involving insurance companies, to optimize the risk management effect and reduce the risk of accidents in megaprojects.Design/methodology/approachBased on principal-agent theory, the research develops the static and dynamic incentive models for risk management in megaprojects, involving both the owner and insurance company. The study examines the primary factors influencing incentive efficiency. The results are numerically simulated with a validation case. Finally, the impact of parameter changes on the stakeholders' benefits is analyzed.FindingsThe results indicate that the dynamic incentive model is available to the achievement of a flexible mechanism to ensure the benefits of contractors while protecting the benefits of the owner and insurance company. Adjusting the incentive coefficients for owners and insurance companies within a specified range promotes the growth of benefits for all parties involved. The management cost and economic benefit allocation coefficients have a positive effect on the adjustment range of the incentive coefficient, which helps implement a more flexible dynamic incentive mechanism to motivate contractors to carry out risk management to reduce risk losses.Originality/valueThis study makes up for the absence of important stakeholders in risk management. Different from traditional megaproject risk management, this model uses insurance companies as bridges to break the island effect of risk management among multiple megaprojects. This study contributes to the body of knowledge by designing appropriate dynamic incentive mechanisms in megaproject risk management through insurance company participation, and provides practical implications to both owner and insurance company on incentive contract making, thus achieving better risk governance of megaprojects.
The indexing work of complex products and systems (CoPS) is to determine a comprehensive set of indicators to ensure seamless integration of CoPS modules. Despite its pivotal role as a pioneering phase in CoPS development, indexing work has garnered relatively scant research attention. This paper explores CoPS indexing work through a network game model that considers a main manufacturer and several suppliers. The primary aim is to discern the key influencing factors affecting CoPS indexing work and elucidate the influence mechanism. Several interesting conclusions have been drawn: (1) subjective, environmental, and structural factors as the three key aspects influencing the CoPS indexing work network; (2) Subjective factors directly influence the agencies’ selection of the optimal effort level for collaborative work, whereas environmental and structural factors indirectly impact their choice by affecting their network centrality; (3) the environmental factors within the indexing work network dictate the rate at which interagent interactions diminish with distance. To demonstrate and validate the research’s findings, an examination of the indexing process of the China Lanxin High-speed Railway is conducted. This study offers new insights into CoPS indexing work, providing both theoretical references and practical suggestions for project teams to improve collaborative efficiency.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
hi@scite.ai
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.