“…Technically, this operation should be provided in reasonable budgets for all processes in 24 hours of the operating period forced in environmental requirements [14]. Recently, the environment protection is considered in the PSO to reduce pollutant productions at thermal power plants discharged in various particles and gasses, like CO, CO 2 , SO x and NO x [2], [3], [12], [14], [15], [18]. To cover these problems, the PSO considers financial and environmental aspects for searching the balance decision between emission dispatch and economic dispatch with its different orientation troughout the EDED formulation as single objective function for determining the optimal solution and plotting a committed schedule of generating unit outputs.…”