“…Table 3 summarizes the ancillary and flexibility services included in the EC operation programs. DG (distribution generator: small hydro, wind, photovoltaic, biomass, fuel cell, cogeneration) and DR consumers and different scale of consumers DRP: Consumers that reduce their energy according to DR target [28] Electric vehicle, PV system Flexibility using electric vehicles [35] Interruptible loads, noninterruptible loads, photovoltaic plant, BESS Flexible loads: Interruptible load [30] Noncontrollable (NCL), controllable loads (CLs), renewable energy sources (RESs), CES Flexible loads: There is no revenue from flexibility [31] BESS, EV, Photovoltaic system Manual frequency restoration reserve (mFRR) or tertiary reserves: BESS is used to provide flexible services [33] Rooftop PV, residential demand, flexible residential loads Increase and reduction in flexible loads [9] PV system (solar panels), BESS, and thermal energy storages: EWH Flexibility bids to the LMO [17] ESS, EV, distpachable generators (DGs), inflexible loads, interruptible loads, reducible loads, shiftable loads DRP: direct load control programs, voluntary, monetary compensation…”