“…In order to solve the problem of timetable rescheduling in railway networks, Dalapati and Paul designed a meta heuristic solution method based on the Bat algorithm. The experimental results showed that this method can efficiently solve the optimization problem of timetable adjustment in railway networks [ 19 ]. Dai et al proposed a L1-minimization neurodynamic optimization method based on augmented Lagrange functions.…”