2018 Clemson University Power Systems Conference (PSC) 2018
DOI: 10.1109/psc.2018.8664062
|View full text |Cite
|
Sign up to set email alerts
|

Optimal Placement of DG in Active Distribution System Incorporating Performance Based Rates

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
2
2

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 13 publications
0
2
0
Order By: Relevance
“…Ex-ante payment for quality regulation is used in Germany [46]. Distribution planning considering reliability evaluation and PBR is conducted in [60][61][62]. The quality of network and quality of the consumed services are typically important for consumers, but not necessarily to the same extent.…”
Section: Service Quality Regulationmentioning
confidence: 99%
“…Ex-ante payment for quality regulation is used in Germany [46]. Distribution planning considering reliability evaluation and PBR is conducted in [60][61][62]. The quality of network and quality of the consumed services are typically important for consumers, but not necessarily to the same extent.…”
Section: Service Quality Regulationmentioning
confidence: 99%
“…The traditional Monte Carlo approach is updated to include time-varying electricity demand profiles and network component failure rates. For reliability evaluation, reference [20] proposes a combination of Monte Carlo simulation and the 2m point estimate process, and the Genetic Algorithm (GA) is used to reduce the penalty-taking cognizance of investment cost by using the reliability tool to find optimal location and size of DG. The GA algorithm drawback is that the encoding and decoding procedures can take a long time to compute.…”
Section: Introductionmentioning
confidence: 99%