2020 IEEE Industry Applications Society Annual Meeting 2020
DOI: 10.1109/ias44978.2020.9391570
|View full text |Cite
|
Sign up to set email alerts
|

Optimal Operation of a real Power Hub based on PV/FC/GenSet/BESS and Demand Response under Uncertainty

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
4

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 16 publications
0
3
0
Order By: Relevance
“…In the investigated local energy communities the uncertainties of PV production and load could be included and solved by e.g. information gap decision theory [39], [40], stochastic programming [41] or robust optimization [42].…”
Section: Discussionmentioning
confidence: 99%
“…In the investigated local energy communities the uncertainties of PV production and load could be included and solved by e.g. information gap decision theory [39], [40], stochastic programming [41] or robust optimization [42].…”
Section: Discussionmentioning
confidence: 99%
“…The application of SP techniques in a real microgrid with demand response capabilities is presented in [23].…”
Section: Resources a Review Of Related Cases And Approaches Followsmentioning
confidence: 99%
“…The authors have presented a bi-level model in [4] to minimise the total costs of an isolated microgrid and maximise the revenues of a storage system using a DR scheme. Mathematical optimisation models in a real energy hub considering demand response under uncertainties have been proposed in [5,6] to minimise the operation costs. Linear and non-linear optimisation models have been proposed in [7,8] to assess the economic feasibility of providing DR programs by hydrogen production units and their effect on power system flexibility.…”
Section: Introductionmentioning
confidence: 99%