2018
DOI: 10.1109/tpwrs.2017.2696571
|View full text |Cite
|
Sign up to set email alerts
|

Optimal Operation Control for Multiple BESSs of a Large-Scale Customer Under Time-Based Pricing

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
27
0

Year Published

2018
2018
2021
2021

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 40 publications
(30 citation statements)
references
References 22 publications
0
27
0
Order By: Relevance
“…OSs in [69][70][71][72][73][74][75][76] maximize PS operators' profit and minimize PS operation costs by means of ESS. The OSs in [69,70] solve the security-constrained unit commitment problem using ESSs' regulation energy.…”
Section: Ps Oss Regulating the Energy Storage Systems Operation Durinmentioning
confidence: 99%
See 1 more Smart Citation
“…OSs in [69][70][71][72][73][74][75][76] maximize PS operators' profit and minimize PS operation costs by means of ESS. The OSs in [69,70] solve the security-constrained unit commitment problem using ESSs' regulation energy.…”
Section: Ps Oss Regulating the Energy Storage Systems Operation Durinmentioning
confidence: 99%
“…The OSs in [69,70] solve the security-constrained unit commitment problem using ESSs' regulation energy. OSs in [72][73][74] optimize the supply and demand market bids and optimally schedule the ESS operation so that the ESS owner can buy cheap energy on the market, temporarily store it in the ESS, and resell it.…”
Section: Ps Oss Regulating the Energy Storage Systems Operation Durinmentioning
confidence: 99%
“…The objective function has been calculated considering the Contracted Power is 10 kW. Among the referenced publications for optimal scheduling, [17] and [22] are the newest ones. The method from [22] aims for the same purpose and considers some real-time control.…”
Section: Energies 2019 12 X For Peer Review 11 Of 17mentioning
confidence: 99%
“…The method from [22] does consider a real-time control, although it is limited to grid power peak prevention.…”
mentioning
confidence: 99%
“…This control strategy manages BESS power and keeps SOC in a defined target region. A two-level control procedure was proposed in [114] to control the unreliability in forecast load and the estimated SOC levels of batteries. This control scheme handles unpredictability in load forecast and SOC calculation in both the scheduling and the real-time control phases.…”
Section: External Pi Regulatorsmentioning
confidence: 99%