2022
DOI: 10.3389/fenrg.2022.865060
|View full text |Cite
|
Sign up to set email alerts
|

Optimal operation and locating method of new energy building with shared charging service

Abstract: In order to cope with global climate change, an electric vehicle (EV) and new energy building are constantly being innovated and improved. With the popularity and application of big data and Internet of Things, the new energy building with available charging piles may also become a charging station, which can solve the problem of difficult charging of EVs and promote the local energy consumption of the building. Therefore, this study proposes a shared charging concept for buildings, that is, shared photovoltai… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 14 publications
0
1
0
Order By: Relevance
“…The power quality in MGs is the key to determining whether MGs can operate stably. When the power quality does not meet the requirements or the power supply is interrupted due to the failure of distribution networks, the DGs will continue to supply the load, thus forming an islanding state of the MGs (Wang et al, 2022a;Liu et al, 2022). After the occurrence of islanding, the DGs should take corresponding control measures to change their inverter control mode, and even implement the corresponding load shedding strategy when the power shortage is serious.…”
Section: Introductionmentioning
confidence: 99%
“…The power quality in MGs is the key to determining whether MGs can operate stably. When the power quality does not meet the requirements or the power supply is interrupted due to the failure of distribution networks, the DGs will continue to supply the load, thus forming an islanding state of the MGs (Wang et al, 2022a;Liu et al, 2022). After the occurrence of islanding, the DGs should take corresponding control measures to change their inverter control mode, and even implement the corresponding load shedding strategy when the power shortage is serious.…”
Section: Introductionmentioning
confidence: 99%