1989
DOI: 10.1080/07474948908836167
|View full text |Cite
|
Sign up to set email alerts
|

Optimal one-sided shewhart control charts with variable sampling intervals

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
60
0
1

Year Published

2000
2000
2017
2017

Publication Types

Select...
4
4

Relationship

0
8

Authors

Journals

citations
Cited by 126 publications
(61 citation statements)
references
References 9 publications
0
60
0
1
Order By: Relevance
“…It is also known that X for the given Y = y is normally distributed with a mean of 100.41 + 0.86y and a variance of (12.57 µm) 2 and that the correlation coefficient between X and Y is ρ = 0.799. Table 3 shows the TRISO fuel sizes measured using the PSA and X-ray methods.…”
Section: Application To a Nuclear Fuel Measurement Systemmentioning
confidence: 99%
See 1 more Smart Citation
“…It is also known that X for the given Y = y is normally distributed with a mean of 100.41 + 0.86y and a variance of (12.57 µm) 2 and that the correlation coefficient between X and Y is ρ = 0.799. Table 3 shows the TRISO fuel sizes measured using the PSA and X-ray methods.…”
Section: Application To a Nuclear Fuel Measurement Systemmentioning
confidence: 99%
“…VSI control charts have received much attention, for example, Reynolds and Arnold, Runger and Montgomery, Reynolds, Costa and Rahim, Lin et al, Chew et al and Zhang Min et al [2][3][4][5][6][7][8].…”
Section: Introductionmentioning
confidence: 99%
“…According to Reynolds and Arnold (1989) and , the VSI chart is better than FSI chart in terms of ATS and ANSS. They also showed that the two sampling intervals VSI chart is optimal for larger gap between two sampling intervals for one-and two-sided Shewhart chart.…”
Section: Variable Sampling Intervals Schemementioning
confidence: 99%
“…investigated the theoretical aspects of a VSI two-sided control charts. Reynolds and Arnold (1989) investigated the theoretical aspects of a VSI one-sided Shewhart control charts. Reynolds (1995) evaluated properties of variable sampling interval control charts.…”
Section: Properties Of Vsi Proceduresmentioning
confidence: 99%
“…Also Reynolds and Arnold (1989) developed general expressions such as ARL and ATS for VSI control charts. But VSI procedures have a disadvantage that is frequent switching between different sampling intervals which requires more cost and effort to administer the process than corresponding FSI procedures.…”
Section: Introductionmentioning
confidence: 99%