2015
DOI: 10.1016/j.renene.2014.10.003
|View full text |Cite
|
Sign up to set email alerts
|

Optimal mix of solar and wind distributed generations considering performance improvement of electrical distribution network

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
75
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
6
3

Relationship

0
9

Authors

Journals

citations
Cited by 187 publications
(77 citation statements)
references
References 34 publications
0
75
0
Order By: Relevance
“…1) Only one DG is connected to the same bus at a time [19]. 2) Similarly, the system considered for the study is operated in balanced mode [19].…”
Section: Results Analysismentioning
confidence: 99%
See 1 more Smart Citation
“…1) Only one DG is connected to the same bus at a time [19]. 2) Similarly, the system considered for the study is operated in balanced mode [19].…”
Section: Results Analysismentioning
confidence: 99%
“…Hybrid PSO (HPSO) is employed to minimize the system loadability for obtaining the optimal place and sizes of DGs for various radial test bus systems [18]. Weighted aggregation PSO (WAPSO) is employed to obtain the size, type and location of DG to be connected with the practical Indian distribution systems [19]. Many algorithms like fireworks optimization algorithm [20] and bacterial foraging algorithm (BFA) [21] are also implemented to obtain DGs placement and their capacities.…”
Section: Introductionmentioning
confidence: 99%
“…where NOCT is nominal operating cell temperature, T amb is the ambient temperature which is assumed to be • C, and Sun is the intensity of the solar radiation. In order to generate the pattern of solar radiation, the beta probability distribution function is used [27] as follows:…”
Section: Solar Cellmentioning
confidence: 99%
“…Here, u c (t) and u b (t) are the continuous and binary control variables vectors, respectively. w i is a weighting factor used to convert the multi-objective optimization problem to a singleobjective optimization problem [22]. C e.g is the cost of energy dispatched from the grid in $/kW h, C exp is the cost of the exported power to the grid in $/kW h, C f is the cost of diesel generator fuel in $/l, C up/d is the start up or shut down cost in $ and C o&m is the maintenance cost in $/h.…”
Section: Optimization Problem Formulationmentioning
confidence: 99%