2014
DOI: 10.1109/tim.2013.2295657
|View full text |Cite
|
Sign up to set email alerts
|

Optimal Meter Placement for Robust Measurement Systems in Active Distribution Grids

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

2
87
0
3

Year Published

2016
2016
2021
2021

Publication Types

Select...
6
1
1

Relationship

1
7

Authors

Journals

citations
Cited by 131 publications
(92 citation statements)
references
References 28 publications
2
87
0
3
Order By: Relevance
“…This follows the recommendation in [23]. We find that the 0.7 crad of [22] is not to be trustworthy for our system. In our simulation, the criterion for |AE| max is defined as 0.07 crad.…”
Section: Dsse Evaluation Metrics and Criteriasupporting
confidence: 69%
See 1 more Smart Citation
“…This follows the recommendation in [23]. We find that the 0.7 crad of [22] is not to be trustworthy for our system. In our simulation, the criterion for |AE| max is defined as 0.07 crad.…”
Section: Dsse Evaluation Metrics and Criteriasupporting
confidence: 69%
“…In [21], the performance of DSSE is acceptable if the |RME| max and the maximum absolute relative voltage angle error of more than 95% of cases are under 1% and 5% respectively. In [22], when more than 95% of cases' |RME| max and |AE| max are under 0.7% and 0.7 crad the state estimation performance is satisfactory, where 1(crad)=0.01(rad). In [9], a 0.6% threshold of |RME| max is used to determine if the DSSE result is satisfactory.…”
Section: Dsse Evaluation Metrics and Criteriamentioning
confidence: 95%
“…An upgrade of the MS is mandatory in order to improve the monitoring and to implement SDN automation. Placement methods should consider both economical and accuracy constraints: for example, both SM and PMU are used in [63,64], considering also possible measurement loss, metrological degradation or network parameter uncertainty [65], while traditional instruments are used in [66,67]. Nevertheless, the DSSE will rely also on pseudo-measurements, which are power consumption/generation data that allow extending the available information on loads/generators and making the system observable jointly with the real-time measurements collected from the field.…”
Section: Distribution System State Estimationmentioning
confidence: 99%
“…In this paper, the best distribution SE is achieved by minimizing the difference between the measured values and calculated values. Recently, the research in [35] reused the Genetic algorithm as an intelligent technique for finding the optimal PMU placement for the state estimation of active distribution systems. In this research, both the accuracy constraint the measurements deficiency is studied in addition to the effect of the DGs on the power flow.…”
Section: Khandelwal Et Al International Journal Of Emerging Researcmentioning
confidence: 99%
“…For achieving the optimal placement, Monte Carlo method is used in addition to Genetic algorithm. Despite the cost of PMUs, more measuring devices and PMUs should be used for ensuring the required accuracy for robust SE [35].…”
Section: Khandelwal Et Al International Journal Of Emerging Researcmentioning
confidence: 99%