2012
DOI: 10.1080/00207543.2011.632503
|View full text |Cite
|
Sign up to set email alerts
|

Optimal maintenance schedule decisions for machine tools considering the user's cost structure

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
21
0
1

Year Published

2013
2013
2017
2017

Publication Types

Select...
5
2
2

Relationship

1
8

Authors

Journals

citations
Cited by 37 publications
(22 citation statements)
references
References 28 publications
0
21
0
1
Order By: Relevance
“…Although the current observations, such as, visual inspection, non-destructive techniques for stress corrosion and fatigue cracks are done in the US Navy's P-3 Orion aircraft [14], but a fatigue life enhancement program has been employed to prolong its life for 10 years. A model has been proposed for obtaining optimal preventive repair and replacement intervals of a machine tool subassembly considering the user's cost structure and the effect of major overhauls [15]. It is calculated that about half of all operating costs of machining operations can be designated to repair and maintenance.…”
Section: Condition Based Maintenance (Cbm)mentioning
confidence: 99%
“…Although the current observations, such as, visual inspection, non-destructive techniques for stress corrosion and fatigue cracks are done in the US Navy's P-3 Orion aircraft [14], but a fatigue life enhancement program has been employed to prolong its life for 10 years. A model has been proposed for obtaining optimal preventive repair and replacement intervals of a machine tool subassembly considering the user's cost structure and the effect of major overhauls [15]. It is calculated that about half of all operating costs of machining operations can be designated to repair and maintenance.…”
Section: Condition Based Maintenance (Cbm)mentioning
confidence: 99%
“…For minimal repair, NF ij can be calculated using formula Kutanoglu, 2003, 2005;Lad and Kulkarni, 2012;Purohit and Lad, 2016):…”
Section: Evaluation Of Atc and Aecmentioning
confidence: 99%
“…Seven recent academic studies from years 2006 -2012 presenting LCC models including maintenance, have been mainly constructed to contain costs along the whole life cycle, designed only for the item in question and from the perspective of one company [1] - [7]. Our general item-level life-cycle model takes account of the point of view of all maintenance network members, i.e.…”
Section: A Step 1: Definition Of the Problem And Cost Elementsmentioning
confidence: 99%
“…A number of life-cycle cost (LCC) models for different kind of products, equipment, machines or systems can be found in the literature [1]- [8]. Although the demand for LCC models is commonly admitted, these models are still often very case-specific, suitable only for the item or the purpose of use in question.…”
Section: Introductionmentioning
confidence: 99%