2017
DOI: 10.1109/tpwrs.2016.2556424
|View full text |Cite
|
Sign up to set email alerts
|

Optimal Location-Allocation of TCSC Devices on a Transmission Network

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
37
0

Year Published

2017
2017
2021
2021

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 63 publications
(37 citation statements)
references
References 26 publications
0
37
0
Order By: Relevance
“…The cost is decreased by 5761 $/h with TCSCs. Under the peak load level, the generation cost for contingency (26)(27)(28)(29)(30), (25)(26)(27) and with TCSCs are slightly higher than that without TCSC. Nevertheless, significant load curtailment reductions can be observed for these three contingencies from Fig.…”
Section: B Subproblemmentioning
confidence: 96%
See 1 more Smart Citation
“…The cost is decreased by 5761 $/h with TCSCs. Under the peak load level, the generation cost for contingency (26)(27)(28)(29)(30), (25)(26)(27) and with TCSCs are slightly higher than that without TCSC. Nevertheless, significant load curtailment reductions can be observed for these three contingencies from Fig.…”
Section: B Subproblemmentioning
confidence: 96%
“…4, it can be seen that the load shedding reductions occur in all the 7 contingencies by installing TCSCs. The load shedding for contingency (15)(16)(17) and (26)(27)(28)(29)(30) are completely eliminated. The largest load shedding reduction is for contingency , the amount of the load curtailment decreases from 73.05 MW to 35.35 MW.…”
Section: B Subproblemmentioning
confidence: 99%
“…Flexible AC transmission system (FACTS) devices are modern power flow control equipment used in transmission systems (TS). OSs in [88][89][90][91][92] maximize the transmission capacity of TS's power lines by changing the FACTS settings. An OS in [93] determines the locations in the TS where it would be optimal to install FACTS to optimize the TS power flows while there are many wind turbines connected to the TS.…”
Section: Ps Oss Controlling a Special Ps Action Hardwarementioning
confidence: 99%
“…On the other hand, apart from resiliency-oriented studies, FACTS devices have been extensively applied for power flow control by taking advantage of recent power electronics progress and FACTS devices oriented studies in literature. Different objectives have been considered for FACTS placement, such as stability improvement, voltage deviation reduction [7], voltage unbalance improvement [8], loss minimization [9], congestion reduction [10], and high renewable penetration enabling [11].…”
Section: Relevant Backgroundmentioning
confidence: 99%