2022
DOI: 10.1016/j.jpdc.2022.07.002
|View full text |Cite
|
Sign up to set email alerts
|

Optimal load balancing and assessment of existing load balancing criteria

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 27 publications
0
1
0
Order By: Relevance
“…Based on the comprehensive consideration of factors, such as the safety, economy, and reliability principle of the power system and the constraints of dispatching objectives, the reliability demand is analyzed first, and then the type, quantity, and working mode of the standby power supply are determined. After calculating and comparing the ratio of the output of different standby power units to the output of each power plant, the optimal strategy combination is selected to solve the problem [11][12]. The algorithm considers the impact of time utility on the power system.…”
Section: Short-term Load Dispatching Methodsmentioning
confidence: 99%
“…Based on the comprehensive consideration of factors, such as the safety, economy, and reliability principle of the power system and the constraints of dispatching objectives, the reliability demand is analyzed first, and then the type, quantity, and working mode of the standby power supply are determined. After calculating and comparing the ratio of the output of different standby power units to the output of each power plant, the optimal strategy combination is selected to solve the problem [11][12]. The algorithm considers the impact of time utility on the power system.…”
Section: Short-term Load Dispatching Methodsmentioning
confidence: 99%