2020
DOI: 10.1016/j.energy.2020.117510
|View full text |Cite
|
Sign up to set email alerts
|

Optimal design of a university campus micro-grid operating under unreliable grid considering PV and battery storage

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
16
0
2

Year Published

2020
2020
2024
2024

Publication Types

Select...
9
1

Relationship

0
10

Authors

Journals

citations
Cited by 52 publications
(27 citation statements)
references
References 22 publications
0
16
0
2
Order By: Relevance
“…Based on the variables and formulation, the final problem can be mixed-integer linear programming (MILP) [110], mixed-integer nonlinear programming [129], quadratic programming [130], etc., which can be solved using different techniques such as Lagrangian multiplier [104], [131], (adaptive) dynamic programming (DP) [132], [133], heuristic methods (PSO, GA, …) [125], [134], etc.…”
Section: A Mgs Optimization/schedulingmentioning
confidence: 99%
“…Based on the variables and formulation, the final problem can be mixed-integer linear programming (MILP) [110], mixed-integer nonlinear programming [129], quadratic programming [130], etc., which can be solved using different techniques such as Lagrangian multiplier [104], [131], (adaptive) dynamic programming (DP) [132], [133], heuristic methods (PSO, GA, …) [125], [134], etc.…”
Section: A Mgs Optimization/schedulingmentioning
confidence: 99%
“…Other works have designed microgrids with energy storage for the integration of renewable generation. In ref [ 9 ], a microgrid with energy storage is proposed for the Savona Campus of the Genoa University (Italy), and in ref [ 10 ] a PV and a battery storage system is proposed for the American University of Beirut (Lebanon). In ref [ 11 ], the design of a PV and energy storage system, integrated with energy efficiency technologies is conducted to achieve a near zero-energy building at the University of Coimbra (Portugal).…”
Section: Related Workmentioning
confidence: 99%
“…Because the isolated MG should be able to supply power to the load using the ESS alone, it is related to the load carrying capacity of the MG [16,22]. Typically, the ESS of an MG is designed to have a significantly larger capacity compared to the PCS of other RESs [23,24]. The EMS of an MG is operated based on the battery SoC [9].…”
Section: Introductionmentioning
confidence: 99%