Optimal Day-ahead Scheduling of Islanded Microgrid Considering Risk-based Reserve Decision

Abstract: Due to the lack of support from the main grid, the intermittency of renewable energy sources (RESs) and the fluctuation of load will derive uncertainties to the operation of islanded microgrids (IMGs). It is crucial to allocate appropriate reserve capacity for the economic and reliable operation of IMGs. With the high penetration of RESs, it faces both economic and environmental challenges if we only use spinning reserve for reserve support. To solve these problems, a multi-type reserve scheme for IMGs is prop… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
7
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 21 publications
(14 citation statements)
references
References 38 publications
0
7
0
Order By: Relevance
“…Constraints in (11) to ( 13) are associated with start-up costs. First stage start-up constraints and second stage start-up constraints are presented in (11) and (12).…”
Section: S Min Tmentioning
confidence: 99%
See 2 more Smart Citations
“…Constraints in (11) to ( 13) are associated with start-up costs. First stage start-up constraints and second stage start-up constraints are presented in (11) and (12).…”
Section: S Min Tmentioning
confidence: 99%
“…Since the start-up constraints are temporal constraints, commitment status at the time, t, (u it , v itω ), and commitment status at (t − 1), (u i,t−1 , v i,t−1,ω ), are considered in (11) and (12). A non-anticipatory constraint connects the first-and second-stage start-up variables in (13).…”
Section: S Min Tmentioning
confidence: 99%
See 1 more Smart Citation
“…The CVaR model for time-varying economic risk with time-sequential security assessment in a probabilistic model containing uncertainty in EV distribution and renewable energy of distribution system is presented in ref [21]. Risk due to reserve shortage while the optimal allocation of reserve capacity for islanded microgrid operation under intermittency of renewable and fluctuation in load is modeled using CVaR in [22]. Risks due to uncertainty associated with solar energy, price, load, and EV's arriving and departing times in optimal scheduling of heating, power, and hydrogen-based micro grid incorporated with renewable energy sources (RES)-PV and plug-in electric vehicle (PEV) are modeled using CVaR in ref.…”
Section: Introductionmentioning
confidence: 99%
“…M ICROGRID (MG) is a small and controllable power grid that integrates distributed generations (e.g., wind and solar generation), loads, and energy storage devices [1]. MG not only provides power for its internal loads, but also acts as an independent stakeholder participating in electricity trading [2].…”
mentioning
confidence: 99%