2015
DOI: 10.15676/ijeei.2015.7.4.12
|View full text |Cite
|
Sign up to set email alerts
|

Optimal Coordination of Overcurrent Relays in Radial System with Distributed Generation Using Modified Firefly Algorithm

Abstract: Overcurrent relays (OCRs) play a vital role in operating the protection of power distribution system. In the presence of distributed generation (DG), OCR coordination is used to ensure reliability and speed of relay operation to avoid unintentional DG disconnection during fault conditions. Therefore, this paper presents an optimal OCR coordination in radial system under the presence of DG. An optimal OCR coordination can be obtained by selecting time dial setting (TDS) and plug setting (PS). A modified firefly… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
5
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 12 publications
(5 citation statements)
references
References 32 publications
0
5
0
Order By: Relevance
“…The primary limitation of this OF is that it only decreases the operating time of the primary relay, which could lead to a longer discrimination time between the primary and backup relays. [15], [17], [18], [21], [23], [26], [27], [36], [37], [41], [42], [48], [51], [55], [57], [59], [61], [64], [66], [70], [76], [79], [80], [86], [87], [92], [95], [97]- [100], [103], [104], [111], [113], [116], [118], [125]- [127], [131]- [136], [138], [141], [143], [144], [174]- [179] 𝑚𝑖𝑛 𝑊 𝑖 ′ 𝑇 𝑖𝑘 Where 𝑇 𝑖𝑘 the operating time of i-th relay for a fault in zone k and 𝑊 𝑖 ′ is a coefficient that represents the probability of the occurrence of the fault on a line.…”
Section: Referencementioning
confidence: 99%
See 4 more Smart Citations
“…The primary limitation of this OF is that it only decreases the operating time of the primary relay, which could lead to a longer discrimination time between the primary and backup relays. [15], [17], [18], [21], [23], [26], [27], [36], [37], [41], [42], [48], [51], [55], [57], [59], [61], [64], [66], [70], [76], [79], [80], [86], [87], [92], [95], [97]- [100], [103], [104], [111], [113], [116], [118], [125]- [127], [131]- [136], [138], [141], [143], [144], [174]- [179] 𝑚𝑖𝑛 𝑊 𝑖 ′ 𝑇 𝑖𝑘 Where 𝑇 𝑖𝑘 the operating time of i-th relay for a fault in zone k and 𝑊 𝑖 ′ is a coefficient that represents the probability of the occurrence of the fault on a line.…”
Section: Referencementioning
confidence: 99%
“…Other objective functions are presented in Table I, including the minimization of the summation of relay operating times for near-end faults. It aims to reduce the overall time of the protection system when dealing with faults that occur close to the relay location [15], [17], [18], [21], [23], [26], [27], [36], [37], [41], [42], [48], [51], [55], [57], [59], [61], [64], [66], [70], [76], [79], [80], [86], [87], [92], [95], [97]- [100], [103], [104], [111], [113], [116], [118], [125]- [127], [131]- [136], [138], [141], [143], [144], [174]- [179]. Additionally, it includes the minimization of the total operating time of all primary relays for both near-end and f...…”
Section: Volume XX 2017mentioning
confidence: 99%
See 3 more Smart Citations