“…Other objective functions are presented in Table I, including the minimization of the summation of relay operating times for near-end faults. It aims to reduce the overall time of the protection system when dealing with faults that occur close to the relay location [15], [17], [18], [21], [23], [26], [27], [36], [37], [41], [42], [48], [51], [55], [57], [59], [61], [64], [66], [70], [76], [79], [80], [86], [87], [92], [95], [97]- [100], [103], [104], [111], [113], [116], [118], [125]- [127], [131]- [136], [138], [141], [143], [144], [174]- [179]. Additionally, it includes the minimization of the total operating time of all primary relays for both near-end and f...…”