2013
DOI: 10.1109/tpwrs.2012.2225852
|View full text |Cite
|
Sign up to set email alerts
|

Optimal coordinated wind-hydro bidding strategies in day-ahead markets

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
54
0

Year Published

2014
2014
2020
2020

Publication Types

Select...
7
1
1

Relationship

0
9

Authors

Journals

citations
Cited by 117 publications
(54 citation statements)
references
References 17 publications
0
54
0
Order By: Relevance
“…In this paper, the parasitic power is assumed constant. Constraints (14) and (15) impose that the electric power from the SF and TES depends on the efficiencies h 1 and h 3 associated with the thermal power of the SF, q FE c;k , and the storage power, q SE c;k , respectively. Constraints (16) set the bounds Q PB c and Q PB c for the sum of the power from the SF and TES.…”
Section: General Milp Approachmentioning
confidence: 99%
See 1 more Smart Citation
“…In this paper, the parasitic power is assumed constant. Constraints (14) and (15) impose that the electric power from the SF and TES depends on the efficiencies h 1 and h 3 associated with the thermal power of the SF, q FE c;k , and the storage power, q SE c;k , respectively. Constraints (16) set the bounds Q PB c and Q PB c for the sum of the power from the SF and TES.…”
Section: General Milp Approachmentioning
confidence: 99%
“…In Refs. [14,15], a modelling for wind power and pumped-storage hydro power plants shows advantages of not only minimizing curtailments and energy imbalances, but also an enhancement on the dispatchability relatively to the standalone wind power plants. Harmonization schemes between wind power and concentrating solar power (CSP) plants are important for the Southern Iberian Peninsula [16], due to favourable wind resources and solar irradiation levels near load centres.…”
Section: Introductionmentioning
confidence: 99%
“…Thus, how to effectively quantify the risk of ESI is still an urgent problem to be solved. Value-at-risk (VaR) and conditional value-at-risk (CVaR), as well-known risk measures, have been widely used in various energy management problems for different entities in the electricity market such as retailers [9], producers [10][11][12], distribution companies [13], and in generation operation planning [14], optimal power flow [15] as well as coordinated energy trading problems [16,17]. improve the forecasting accuracy, uncertain energy consumption fashion in local-area still poses an enormous dilemma regarding the appropriate implementation of prediction algorithms.…”
Section: Introductionmentioning
confidence: 99%
“…Also, schemes based on the coordination of wind and hydro power, specially pumped-storage hydro power plants [8,9], unveiled an improvement on minimization of curtailment, energy imbalance and dispatchability. Furthermore, electrical vehicles connection to the power grid are expected to be used as controllable loads and a convenient operation with suitable market design may help accommodate more wind power [10].…”
Section: Introductionmentioning
confidence: 99%