2017
DOI: 10.1016/j.anucene.2016.12.024
|View full text |Cite
|
Sign up to set email alerts
|

Operator response modeling and human error probability in TRIGA Mark II research reactor probabilistic safety assessment

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(2 citation statements)
references
References 9 publications
0
2
0
Order By: Relevance
“…As a final safety measure, the operator should manually shut down the pump and initiate the TRIGA IPR-RI Reactor Local Emergency Plan immediately. Marques (2018) [13] predicted the human error probability regarding "operator does not initiate the shutdown" using the Standardized Plant Risk-Human Reliability Analysis (SPAR-H) method and concluded an acceptable error rate for the TRIGA IPR-RI reactor of 2.5 × 10 -², which is a value comparable to other similar TRIGA facilities [22,23]. Even in scenarios where prior safety measures fail, the likelihood of preventing a LOCA event by the group of operators renders this accident not constituting an unacceptable risk concerning the safety management of the facility.…”
Section: Loss Of Coolant Through Primary Circuit Rupture Without a Pu...mentioning
confidence: 99%
“…As a final safety measure, the operator should manually shut down the pump and initiate the TRIGA IPR-RI Reactor Local Emergency Plan immediately. Marques (2018) [13] predicted the human error probability regarding "operator does not initiate the shutdown" using the Standardized Plant Risk-Human Reliability Analysis (SPAR-H) method and concluded an acceptable error rate for the TRIGA IPR-RI reactor of 2.5 × 10 -², which is a value comparable to other similar TRIGA facilities [22,23]. Even in scenarios where prior safety measures fail, the likelihood of preventing a LOCA event by the group of operators renders this accident not constituting an unacceptable risk concerning the safety management of the facility.…”
Section: Loss Of Coolant Through Primary Circuit Rupture Without a Pu...mentioning
confidence: 99%
“…It is worth noting that largescale aerospace composite parts often have thousands of holes that need to be riveted [7]. Manual riveting consumes a lot of manpower, is inefficient, and is prone to human error [8]. Therefore, there is the urgent need for a method or apparatus that will enable on-machine automatic measurement of through-hole depth, offering vital technical support to automatic drilling and riveting of largescale composite board parts.…”
Section: Introductionmentioning
confidence: 99%