Operations of Electric Power Systems with High Penetration of Wind Power: Risks and Possible Solutions

Abstract: Abstract-This paper provides an assessment of wind power effects on technical and economic performance of today's electric power systems. While a small penetration of wind power is unlikely to cause any qualitative changes, significant deployment of wind-generated power will require a major rethinking of generation dispatch and automatic generation control, in particular. We summarize technical risks, as well as the economic implications on total cost of providing power to customers. The discussion is presente… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
7
0

Year Published

2010
2010
2017
2017

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 16 publications
(7 citation statements)
references
References 7 publications
0
7
0
Order By: Relevance
“…28 For instance, in cases where the SO defi nes the reserve requirements on the basis of deterministic criteria, the awareness of this overestimation may lead to a highly conservative attitude and an adoption of high safety margins to minimize the risk-and will therefore heavily increase the operational costs. Also, as mentioned in Ilic et al, 29 imbalances may aggravate potentially large out-of-merit automatic generation control costs. All of these operational costs will be part of the tariff paid by all customers.…”
Section: System Operator's Viewpointmentioning
confidence: 99%
“…28 For instance, in cases where the SO defi nes the reserve requirements on the basis of deterministic criteria, the awareness of this overestimation may lead to a highly conservative attitude and an adoption of high safety margins to minimize the risk-and will therefore heavily increase the operational costs. Also, as mentioned in Ilic et al, 29 imbalances may aggravate potentially large out-of-merit automatic generation control costs. All of these operational costs will be part of the tariff paid by all customers.…”
Section: System Operator's Viewpointmentioning
confidence: 99%
“…As the source BA, BPA provides Generation Imbalance Service, by default, 2 for IPPowned wind facilities; even though most of the wind is exported from Bonneville's BA, thus obligating BPA to carry a large amount of regulation reserve. Regulation reserve (regulation, load following, and generation imbalance 3 ) is provided from Federal Hydro Projects. Federal Hydro Projects include 31 dams on the Columbia River and its tributaries, with a total nameplate rating of installed hydro generation capacity of 20,430 MW.…”
Section: Business Modelmentioning
confidence: 99%
“…Management of hydro projects is very complex and subject to many constraints based on the Endangered Species Act (which requires flow to 2 FERC Order 890, Schedule 9. 3 Generation Imbalance is an integral of Scheduled MW flow minus Actual MW flow over one clock-hour period. support fish migration and spawning) and the Clean Water Act (which imposes minimum generation conditions).…”
Section: Business Modelmentioning
confidence: 99%
“…For instance, in cases where the SO defines the reserve requirements on the basis of deterministic criteria, the awareness of this overestimation may lead to a highly conservative attitude and an adoption of high safety margins to minimize the risk -and will therefore heavily increase the operational costs. In addition, as mentioned in [33], imbalances may aggravate potentially large out-of-merit automatic generation control (AGC) costs. All of these operational costs will be part of the tariff paid by all customers.…”
Section: System Operator's Viewpointmentioning
confidence: 99%