2018
DOI: 10.1021/acs.iecr.7b03275
|View full text |Cite
|
Sign up to set email alerts
|

Operation Scheduling Optimization of a Transfer Hub with Multiple Tank Farms Based on a New Continuous Time Representation

Abstract: This study addresses the operation-scheduling problem of a transfer hub with multiple tank farms (M-TH) connected to a multiproduct pipeline network. As part of the pipeline network, the THs serve as links that receive, store, and deliver oil products. Previous scheduling optimization works on pipeline networks with oil products largely focused on the batch plans of each pipeline, without considering the operation schedule of the THs. In this study, the main task is to optimize the loading and unloading schedu… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2019
2019
2019
2019

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 20 publications
(29 reference statements)
0
1
0
Order By: Relevance
“…Similarly, the work [15] uses dynamic programming algorithm to solve the optimal operation scheduling between a pumping station and multiple pumps for the reduction for energy and maintenance cost. The recent paper [16] studies the operation schedule of the multiple tank farms with continuous time representation for a multiproduct pipeline network to receive and deliver oil products. In the proposed pump and compressor scheduling research, the most widely adopted performance metrics have been merely focus on minimizing the operational cost.…”
Section: Related Workmentioning
confidence: 99%
“…Similarly, the work [15] uses dynamic programming algorithm to solve the optimal operation scheduling between a pumping station and multiple pumps for the reduction for energy and maintenance cost. The recent paper [16] studies the operation schedule of the multiple tank farms with continuous time representation for a multiproduct pipeline network to receive and deliver oil products. In the proposed pump and compressor scheduling research, the most widely adopted performance metrics have been merely focus on minimizing the operational cost.…”
Section: Related Workmentioning
confidence: 99%