2016 China International Conference on Electricity Distribution (CICED) 2016
DOI: 10.1109/ciced.2016.7576064
|View full text |Cite
|
Sign up to set email alerts
|

Operation and maintenance analysis for power communication networks based on big data

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
4
1
1

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(5 citation statements)
references
References 2 publications
0
5
0
Order By: Relevance
“…In the first stage of the game, defense resources are allocated to CEs. Among them, certain defense resources are allocated to CEs (6,4), (4,6), (7,6), (6,7), (9,7), (7,9), (13,15), (15,13), (14,7), (7,14), (14,15), (15,14), (16,8), (8,16), (16,17), (17,16), (17,20), (20,17), (18,19), (19,18), (19,20), and (20,19). The failure probabilities p ij during attack are 0.769, 0.769, 0.769, 0.769, 0.769, 0.833, 0.833, 0.833, 0.833, 0.472, 0.472, 0.833, 0.833, 0.714, 0.714, 0.769, 0.769, 0.909, 0.909, 0.625, 0.625, 0.556, and 0.556, respectively.…”
Section: Simulation Experiments On the Three-stage Process Of Cpps At...mentioning
confidence: 99%
See 3 more Smart Citations
“…In the first stage of the game, defense resources are allocated to CEs. Among them, certain defense resources are allocated to CEs (6,4), (4,6), (7,6), (6,7), (9,7), (7,9), (13,15), (15,13), (14,7), (7,14), (14,15), (15,14), (16,8), (8,16), (16,17), (17,16), (17,20), (20,17), (18,19), (19,18), (19,20), and (20,19). The failure probabilities p ij during attack are 0.769, 0.769, 0.769, 0.769, 0.769, 0.833, 0.833, 0.833, 0.833, 0.472, 0.472, 0.833, 0.833, 0.714, 0.714, 0.769, 0.769, 0.909, 0.909, 0.625, 0.625, 0.556, and 0.556, respectively.…”
Section: Simulation Experiments On the Three-stage Process Of Cpps At...mentioning
confidence: 99%
“…In the second stage of the game, the CEs corresponding to the optimal attack matrix Z * are (4,6), (6,7), (3,8), and (16,17). At this point, the attack benefit U A , i.e., the expected loss of load G from the power grid, is 417.88 MW.…”
Section: Simulation Experiments On the Three-stage Process Of Cpps At...mentioning
confidence: 99%
See 2 more Smart Citations
“…Attached are references of advanced maintenance proposals applied to different fields of activity:Núñez et al (2014), Li et al (2017); railway equipment.Ning et al (2014); boat equipment.Munirathinam and Ramadoss (2014); electronic equipment.Lee et al (2014), Yan et al (2017); machines.Li et al (2015); product life cycle.Yau and Chuang (2015); bridges.Alarcón (2016); buildings.Shi et al (2016); electrical networks.Volovoi (2016); complex repairable systems.Wan et al (2017), Zhang et al (2017); factories and workshops.…”
Section: The Product Operation Phase With Maintenance 40mentioning
confidence: 99%