2006
DOI: 10.1002/er.1203
|View full text |Cite
|
Sign up to set email alerts
|

Operating schedule of a combined energy network system with fuel cell

Abstract: SUMMARYThe chromosome model showing system operation pattern is applied to GA (genetic algorithm), and the method of optimization operation planning of energy system is developed. The optimization method of this operation planning was applied to the compound system of methanol-steam-reforming-type fuel cell, geothermal heat pump and the electrolysis tank of water. The operation planning was performed for the energy system using the energy demand pattern of the individual residence of Sapporo city. From analysi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2009
2009
2020
2020

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 13 publications
(1 citation statement)
references
References 7 publications
0
1
0
Order By: Relevance
“…In terms of capacity allocation, the existed researches mainly how to choose different power sources, thermal sources, and energy storage to construct a hybrid energy system. Obara developed a method of optimization operation planning of energy system and applied the chromosome model showing system operation pattern to GA (genetic algorithm). Aboelsood et al took the example of MG, which included WPP, SC, CHP, EB, heat storage tank (HSK), and energy storage device to get the optimal operation cost of the system during the scheduling period.…”
Section: Introductionmentioning
confidence: 99%
“…In terms of capacity allocation, the existed researches mainly how to choose different power sources, thermal sources, and energy storage to construct a hybrid energy system. Obara developed a method of optimization operation planning of energy system and applied the chromosome model showing system operation pattern to GA (genetic algorithm). Aboelsood et al took the example of MG, which included WPP, SC, CHP, EB, heat storage tank (HSK), and energy storage device to get the optimal operation cost of the system during the scheduling period.…”
Section: Introductionmentioning
confidence: 99%