All Days 2010
DOI: 10.2118/127792-ms
|View full text |Cite
|
Sign up to set email alerts
|

Open-Hole Solid Expandables Eliminate Slim-Hole Configuration in Integrated Solution Workover Well

Abstract: In Algeria about 60% of the proven oil reserves are in the Hassi Messaoud region which was discovered in the 1950's. Several oil production wells drilled over 40 years ago have been shut in and are awaiting workover plans to revive those wells and get them back into economic production. A typical workover program is comprised of extending the open-hole in the reservoir zone, below 7-inch casing, and producing that through a new 4-1/2-inch perforated production liner. At the time of initial drilling of those we… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2011
2011
2012
2012

Publication Types

Select...
3

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
references
References 2 publications
0
0
0
Order By: Relevance