2012
DOI: 10.1049/iet-gtd.2011.0265
|View full text |Cite
|
Sign up to set email alerts
|

Online market-based rescheduling strategy to enhance power system stability

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
9
0
2

Year Published

2012
2012
2023
2023

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 20 publications
(11 citation statements)
references
References 15 publications
0
9
0
2
Order By: Relevance
“…Indeed, the proposed method can be further improved by comparatively resembles with the situation utterly taking place in a deregulated power system which allows utility to adjust or shift the existing energy market so that remedial action could be taken by the generating companies to ensure the system stability is attained. Hence, optimization of energy market is introduced in the second technique of generators rescheduling by considering cost minimization of as the objective function given in (30) [10], [30], [31]. The linear bidding strategy is used to design the expression in (30).…”
Section: Rescheduling Of Critical Generators For a New Atc Determimentioning
confidence: 99%
See 1 more Smart Citation
“…Indeed, the proposed method can be further improved by comparatively resembles with the situation utterly taking place in a deregulated power system which allows utility to adjust or shift the existing energy market so that remedial action could be taken by the generating companies to ensure the system stability is attained. Hence, optimization of energy market is introduced in the second technique of generators rescheduling by considering cost minimization of as the objective function given in (30) [10], [30], [31]. The linear bidding strategy is used to design the expression in (30).…”
Section: Rescheduling Of Critical Generators For a New Atc Determimentioning
confidence: 99%
“…The applicability of this method is arising from its fast response in rescheduling the critical generators compatible for an immediate restoration of the inter-area oscillation which occurs only within a short time interval of 10 to 20 s subsequent to a disturbance [9]. Hoballah et al [10] has introduced the combination of modified particle swarm optimization (PSO) and artificial neural network utilized as a new approach in solving the market based generators rescheduling while ensuring the enhancement of transient and oscillatory stability. In particular, the generators rescheduling were performed by referring to the market based energy bidding approach.…”
mentioning
confidence: 99%
“…where Φ −1 is the inverse function of the normal distribution with mean zero and standard deviation one, E(ζ sys ) N and σ'(ζ sys ) N are the mean and the variance of the measure of global damping of the system ζ sys , which is determined throughout every sampled operating condition by using (2). ε r is the value of the relative error demanded for the results, 1 − δ is the specified coverage probability (0 < δ < 1) and N is the actual sample size.…”
Section: Monte Carlo-based Pementioning
confidence: 99%
“…Therefore, one pragmatic solution is to select a small set of key variables that needs less computation resources, but, nevertheless, enables a reliable estimation for transient instability. The methods to estimate transient stability can be classified into model-based methods (Vu and Turitsyn, 2016) and artificial intelligence-based methods (Hoballah and Erlich, 2012;Cepeda et al, 2014;Wang et al, 2016). The latter requires reduced computation effort to make fast estimations.…”
Section: Introductionmentioning
confidence: 99%