Online decision-making and control of power system stability based on super-real-time simulation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
8
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 17 publications
(8 citation statements)
references
References 0 publications
0
8
0
Order By: Relevance
“…With less than four references per application, PHC technologies have been used in dynamic state estimation [94,200,201], power system planning [236,237], TSCOPF [230,231], power system reliability [238,239], electromagnetic transient simulation [91,92], dynamic models [2,216], short circuit analysis [235], security constrained economic dispatch [242], probabilistic power flow [224], and hydro thermal scheduling [243]. In ref.…”
Section: Other Applicationsmentioning
confidence: 99%
“…With less than four references per application, PHC technologies have been used in dynamic state estimation [94,200,201], power system planning [236,237], TSCOPF [230,231], power system reliability [238,239], electromagnetic transient simulation [91,92], dynamic models [2,216], short circuit analysis [235], security constrained economic dispatch [242], probabilistic power flow [224], and hydro thermal scheduling [243]. In ref.…”
Section: Other Applicationsmentioning
confidence: 99%
“…The rated frequency of the EPG is f S . During simulations, the time derivative f˙C OI is calculated, as shown in (9), to determine the trend of frequency changes after f COI is obtained at each integration step. If f˙C OI (t − Δt) < 0 and f˙C OI (t) > 0, f COI (t − Δt) is a local minimum point on the f COI trajectory.…”
Section: Frequencymentioning
confidence: 99%
“…If the current operation state or the contingency is not taken into account during the offline pre-decision-making, the strategy table may not work properly, leading to inaccuracy or even mismatch. The online pre-decision-making ECS introduces the telemetering signals and data measured by external systems such as the energy management system and the wide-area measurement system (WAMS) into the offline pre-decision-making ECS so that the strategy table can be updated by online calculations at regular intervals according to the current operation state of the power grid [3][4][5][6][7][8][9][10]. The ECS requires the decision-making process to be fast.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…The implementation scheme of generator tripping is calculated by offline simulations in the early period [2, 3]. Then the online simulations are gradually adopted to make the decision of generator tripping control [4, 5]. However, the computational burden of simulations becomes rather heavy with the development of the grid.…”
Section: Introductionmentioning
confidence: 99%