2007
DOI: 10.1016/j.ces.2006.12.081
|View full text |Cite
|
Sign up to set email alerts
|

On the use of graphical method to determine the targets of single-contaminant regeneration recycling water systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
111
0

Year Published

2008
2008
2016
2016

Publication Types

Select...
7
2
1

Relationship

1
9

Authors

Journals

citations
Cited by 110 publications
(111 citation statements)
references
References 16 publications
0
111
0
Order By: Relevance
“…Other works on regeneration systems were also reported Feng et al, 2007). However, these works were limited to fixed load problem.…”
Section: Resource Conservation Networkmentioning
confidence: 99%
“…Other works on regeneration systems were also reported Feng et al, 2007). However, these works were limited to fixed load problem.…”
Section: Resource Conservation Networkmentioning
confidence: 99%
“…The processes that use large amount of water rate such as cooling tower, Ion exchangers, and Service water used in desalter, fuel carbon cracking, Lube plant, caustic treating and laboratory in the refinery were selected [15][16][17][18][19]. They use total rate of 565 m 3 /h which is equivalent to 82.5% of the total water rate used by the refinery.…”
Section: Economic Evaluationmentioning
confidence: 99%
“…grey water utilization) and social acceptance of water reuse, water systems integration is being implemented in many industries in order to ensure an efficient use of the water resources [1,2]. This technology entails the integration of the wastewater generated by an industrial equipment/process after its treatment or directly in the industrial lines by continuous loops of water recirculation [3,4]. The potential for water saving in industry is enormous since it has been estimated that the industrial sector is responsible for up to 25% of the total water consumption in the world [5].…”
Section: Introductionmentioning
confidence: 99%