Offshore Technology Conference 1988
DOI: 10.4043/5820-ms
|View full text |Cite
|
Sign up to set email alerts
|

On The Upgrading Of Sscv Hermod To Increase Its Lifting Capacity And The Dynamics Of Heavy-Lift Operations

Abstract: The dual crane lifting capacity of the semisub:nersible crane vessel Hennod was during winter refit of 1985-86 increased from 5000 sh.t to 9000 sh.t. How this was achieved is described and commented upon with emphasis placed on changes and roodifications of hull fonn, upgrading of cranes and the enhancement of the dynamic ballasting systen of the vessel.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

1992
1992
2003
2003

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 2 publications
(2 reference statements)
0
1
0
Order By: Relevance
“…Patel et al (1987) offer a higher estimate of 1% for the vertical motion and 5% for the lateral motions. Willemstein et al (1986), van den Boom et al (1987van den Boom et al ( , 1988, Patel et al (1987), and Michelsen and Coppens (1988) found, using numerical simulation, that both stationary and transient dynamic forces due to payload motions are large enough that they need to be accounted for in the design and operation of cranes, thus emphasizing the need to predict and control both transient and stationary responses of the payload to excitations. Suppression of payload pendulations/oscillations is especially important for offshore cranes.…”
Section: Introductionmentioning
confidence: 99%
“…Patel et al (1987) offer a higher estimate of 1% for the vertical motion and 5% for the lateral motions. Willemstein et al (1986), van den Boom et al (1987van den Boom et al ( , 1988, Patel et al (1987), and Michelsen and Coppens (1988) found, using numerical simulation, that both stationary and transient dynamic forces due to payload motions are large enough that they need to be accounted for in the design and operation of cranes, thus emphasizing the need to predict and control both transient and stationary responses of the payload to excitations. Suppression of payload pendulations/oscillations is especially important for offshore cranes.…”
Section: Introductionmentioning
confidence: 99%