2018
DOI: 10.24223/1999-5555-2018-11-2-154-160
|View full text |Cite
|
Sign up to set email alerts
|

On the system of ensuring electrical safety of maintenance works performed on 35 – 750 kV power transmission lines being under induced voltage implemented in the Republic of Belarus

Abstract: The article studies the matters of physics of interaction of parallel overhead power transmission lines. Cases are presented, where the maximum induced voltage values are expected on individual sections of closely approaching de-energized and energized power transmission lines. Possible scenarios are presented of direct contact with an unearthed conductor (wire) of OPL in the normal operation mode. Substantiation is presented of review of the list of the lines, which, when de-energized or earthed at terminal s… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles