“…Note that the adjustable loads utilised in this paper are responsive to price changes and controlling signals from the microgrid controller so that no compensation costs are considered. It should be mentioned that b = 0, which would appear in (17), (19), (21), (23), (28), (31), (33), (36), represents the last day of the previous scheduling horizon, and T represents the last scheduling hour, i.e. T = 24 h.…”