IET Conference Publications 2009
DOI: 10.1049/cp.2009.1056
|View full text |Cite
|
Sign up to set email alerts
|

On-site condition assessment of HV cable terminations in service

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2010
2010
2015
2015

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 3 publications
0
1
0
Order By: Relevance
“…For example, a 500 kV cable joint failure caused a serious power blackout in central area of Shanghai China on 5 June 2013. Partial discharges (PD) is a predecessor to breakdown of polymer insulation, thus PD measurement is an effective method to evaluate the insulation of power cable, and many kinds of sensors and methods have been developed [2][3][4][5][6][7][8][9]. Generally, there are mainly two ways for detecting PD pulses travelling along the cable: using high frequency current transformers or using capacitive couplers.…”
Section: Introductionmentioning
confidence: 99%
“…For example, a 500 kV cable joint failure caused a serious power blackout in central area of Shanghai China on 5 June 2013. Partial discharges (PD) is a predecessor to breakdown of polymer insulation, thus PD measurement is an effective method to evaluate the insulation of power cable, and many kinds of sensors and methods have been developed [2][3][4][5][6][7][8][9]. Generally, there are mainly two ways for detecting PD pulses travelling along the cable: using high frequency current transformers or using capacitive couplers.…”
Section: Introductionmentioning
confidence: 99%