2008
DOI: 10.3182/20080706-5-kr-1001.00059
|View full text |Cite
|
Sign up to set email alerts
|

On Propagating Requirements and Selecting Fuels for a Benson Boiler

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
14
0

Year Published

2009
2009
2012
2012

Publication Types

Select...
5
2

Relationship

5
2

Authors

Journals

citations
Cited by 9 publications
(15 citation statements)
references
References 3 publications
0
14
0
Order By: Relevance
“…The functions in (4) are in this work assumed sufficiently smooth (C and explanation of the above quantities can be found in [14], [12], [13], and [10]. A prognosis of the next days's electricity consumption is established by Energinet.dk 4 , which is responsible for the electrical grid in Denmark.…”
Section: Problem Formulationmentioning
confidence: 99%
See 2 more Smart Citations
“…The functions in (4) are in this work assumed sufficiently smooth (C and explanation of the above quantities can be found in [14], [12], [13], and [10]. A prognosis of the next days's electricity consumption is established by Energinet.dk 4 , which is responsible for the electrical grid in Denmark.…”
Section: Problem Formulationmentioning
confidence: 99%
“…The optimization in (14) has been implemented using YALMIP with the following constants used for the parameters in (32) and (38) h = 192s, β q = 0.05, T = 86400s, N = 450, and solved using the quadratic solver BPMPD. Remark that the sampling time of 192 s yielding 450 discrete points in time is close to the limit of the capabilities of the computer used for the optimization.…”
Section: Discrete Optimizationmentioning
confidence: 99%
See 1 more Smart Citation
“…An attempt of this has been presented in [7] where functionals describing the business objectives are maximized. This work will also follow this approach and utilize notions from production economics.…”
Section: Introductionmentioning
confidence: 99%
“…An attempt of this has been presented in [8] where functionals describing the business objectives are maximised. In [8] heuristics was used to solve the problem and the functionals encapsulated both the economical value and business objective measures.…”
mentioning
confidence: 99%