Offshore Production Units for Pre-Salt Projects

Abstract: Petrobras and partners have been developing Brazilian Santos Basin Pre-Salt ultra-deepwater areas through the use of Floating Production Storage and Offloading Units (FPSOs), equipped with topside facilities designed to receive produced fluids and process them to generate end streams to export and injection. The large hydrocarbon volumes in Santos Basin Pre-Salt areas, which have been successively confirmed by the results of exploratory and productions wells, have encouraged Petrobras and partne… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
7
0
1

Year Published

2020
2020
2024
2024

Publication Types

Select...
4
3
1

Relationship

0
8

Authors

Journals

citations
Cited by 19 publications
(10 citation statements)
references
References 2 publications
0
7
0
1
Order By: Relevance
“…Para este cenário a estratégia adotada foi a instalação de grandes ramais para escoamento do gás e o escoamento do petróleo através de navios aliviadores para os principais terminais do país, conforme ilustrado na Figura 14, direcionando assim a escolha do FPSO como sistema principal de produção nesta região, conforme discutido em Andrade et al [1] .…”
Section: Figura 13 Configuração Do Campo De Kizomba a [8]unclassified
“…Para este cenário a estratégia adotada foi a instalação de grandes ramais para escoamento do gás e o escoamento do petróleo através de navios aliviadores para os principais terminais do país, conforme ilustrado na Figura 14, direcionando assim a escolha do FPSO como sistema principal de produção nesta região, conforme discutido em Andrade et al [1] .…”
Section: Figura 13 Configuração Do Campo De Kizomba a [8]unclassified
“…In the pre-salt cluster in Brazil, the Angra dos Reis FPSO is equipped with metal oxide fixed bed, lowering the H2S content from 170 ppmv to 5 ppmv (de Andrade et al, 2015). This is the key reason why such equipment is modeled in this work.…”
Section: H2s Removal From Gas By Iron Oxidementioning
confidence: 99%
“…Sm 3 /d of gas. In addition, concerning the gas plant, the main concept of FPSO consists in the following steps (ANDRADE et al, 2015):…”
Section: Composition Crude Oil Gas and Reservoir Fluidmentioning
confidence: 99%
“…Source: (ANDRADE et al, 2015) Although, the approach for connecting the pre-salt reservoirs to existing infrastructures, or existing units retrofitting were evaluated. In some cases, those strategies cannot provide by existing FPSO to address the requested capacities.…”
Section: Composition Crude Oil Gas and Reservoir Fluidmentioning
confidence: 99%
See 1 more Smart Citation