Handbook of Offshore Engineering 2005
DOI: 10.1016/b978-0-08-044381-2.50021-7
|View full text |Cite
|
Sign up to set email alerts
|

Offshore Installation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2019
2019
2019
2019

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 5 publications
0
2
0
Order By: Relevance
“…Another important component in the VLFSS is the mooring line. Essentially the mooring line is a selected line connected between the floating solar and the anchor [17]. The function of this mooring line is to secure and tie the structure from drifting away from exact location.…”
Section: Floating Solar 21 Overviewmentioning
confidence: 99%
See 1 more Smart Citation
“…Another important component in the VLFSS is the mooring line. Essentially the mooring line is a selected line connected between the floating solar and the anchor [17]. The function of this mooring line is to secure and tie the structure from drifting away from exact location.…”
Section: Floating Solar 21 Overviewmentioning
confidence: 99%
“…To stabilise and optimise such system during its operation, a special anti-motion device or mooring system is needed, which consists of anchor and connectors and is connected to the floating structure by a mooring line [15][16][17][18]. The catenary mooring system is the most commonly used for installation in shallow water, the catenary mooring system is used.…”
Section: Introductionmentioning
confidence: 99%