2022
DOI: 10.3389/fenrg.2022.849064
|View full text |Cite
|
Sign up to set email alerts
|

Numerical Simulation Study on Optimal Shut-In Time in Jimsar Shale Oil Reservoir

Abstract: The volume fracturing technology along with horizontal well is the main technology to obtain commercial oil flow in shale reservoirs because of the low porosity and low permeability. Whether the fracturing fluid has the potential of shale matrix imbibition oil recovery after a large amount of slickwater injected into the reservoir is a research hotspot at present. Therefore, it is of great significance to study the law of imbibition and replacement during the shut-in time. Aiming at the Jimsar area, there are … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
2
1

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 20 publications
0
1
0
Order By: Relevance
“…Currently, hydraulic fracturing is the main technology of economic and effective development of unconventional oil and gas reservoirs. Due to the large amount of fracturing fluid entering underground, the fluids still flow out of the wellbore with oil and gas for a long time, even after the flowback [3]. Therefore, operators are concerned with the flowback performance and its impact on productivity.…”
Section: Introductionmentioning
confidence: 99%
“…Currently, hydraulic fracturing is the main technology of economic and effective development of unconventional oil and gas reservoirs. Due to the large amount of fracturing fluid entering underground, the fluids still flow out of the wellbore with oil and gas for a long time, even after the flowback [3]. Therefore, operators are concerned with the flowback performance and its impact on productivity.…”
Section: Introductionmentioning
confidence: 99%