“…2b shows that when materials of a higher temperature and lower density are moving toward the bottom of the puddle, the buoyancy forces tend to rise up the liquid flow across the center of the pool. The flow moves radially outward, the molten metal is forced along the surface and then down the side of the weld pool toward the bottom (Domey et al, 1995). In the IEA technique, the electric arc is established within the feeding plates and as soon as the filler metal and feed metal are melted, liquid metal with low density is supplied into the joint geometry at high temperature.…”